Engineering Design Consultancy Company

+31 (0) 20-3085452
[email protected]

Parnassusweg 819
Amsterdam, Netherlands
Mon-Fri
08:00 – 17:00

Project Details:

Concept and detailed design including Tier 3 supplied from Airport district cooling plant with air cooled chillers backup and thermal storage tank to provide continuous chilled water flow during power outage via UPS driven pumps for a maximum period of 15 minutes or until generators Starts / Down Flow CRAC A/C architecture

Scroll to Top